Our products are created by modern computerized equipment and equipment. We offer you OEM support. In the meantime, our items are made according to higher top quality specifications, and complying with the worldwide innovative normal requirements.
Steel quality: S235, Surface therapy: Hot dip galvanized or Electroplated.
ItemNo. | Description | Bodyweight (kgs) |
---|---|---|
CSBRC | Board returning clamp | .65KGS |
[Coupler Solution Family members]
We have distinct sorts of couplers, British Design Coupler, German Fashion Coupler, US Style Coupler, Solitary Clamp and so on, all is dependent on your needs. Parts like metal plank, wood plank and EPT ladders operate with tube and couplers to kind EPTTant parts in the EPTT technique.
one) Pressed Coupler
EPT Diameter: | forty eight.six mm |
Nut Dimension: | 17mm, 19mm, 21mm, 22mm |
EPT: | Q235 |
T-Bolt: | 12mm or 14mm |
Surface Remedy: | Yellow / White Zinc Plate or Sizzling Dip Galvanized |
Merchandise No. | Description | Excess weight(kgs) |
PDC5 | Pressed EPTT Coupler – 5mm thickness | .eighty five |
PSC5 | Pressed Swivel Coupler – 5mm thickness | 1.03 |
PDC3 | Pressed EPTT Coupler – 3mm thickness | .65 |
PSC3 | Pressed Swivel Coupler – 3mm thickness | .sixty five |
PSLC | Pressed Sleeve Coupler – five.0mm thickness | one.25 |
PPTG | Pressed Putlog | .65 |
PLC | Limpet Coupler | .33 |
two) Forged Coupler
T-Bolt: | 12mm or 14mm |
Nut Measurement: | 17mm, 19mm, 21mm, 22mm |
Surface area Treatment method: | (JCEP) Galvanized |
Product No. | Description | Fat(kgs) |
FEDC | EPT Design EPTT Coupler | 1.05 |
FESC | EPT Style Svivel Coupler | one.15 |
FGDC | German Type EPTT Coupler | one.two |
FGSC | German Type Svivel Coupler | 1.34 |
FEPTTC | EPT Responsibility EPTT Coupler | 1.5 |
FHSC | EPT Obligation Swivel Coupler | 1.7 |
FPTG | Putlog | .sixty five |
FBC | Beam Coupler | 1.five |
FSGC | Swivel GirEPTTCoupler | 1.six |
FGB | GirEPTTBeam | one.five |
FSLC | Sleeve Coupler | 1.03 |
FJP | EPTt Pin | 1.1 |
FRC | ReXiHu (West EPT) Dis.Hu (West EPT) Dis. Coupler | .65 |
EPT and clamp scaffold, is a functional kind of scaffold consisting of steel tubes and clamps. Vertical tubes are related to horizontal tubes by means of rigEPTT angle clamps. Diagonal tubes are periodically connected to the scaffold through swivel clamps in orEPTTto stabilize the scaffold.
This variety of scaffold is EPTTly employed where unlimited versaEPTTty is JCEP. In several countries, it is typical in construction. Horizontal tubes (and therefore going for walks-decks) can be put at any heigEPTT aEPTT the vertical tube (as permitted by engineering constraints), and vertical tubes, or legs, can be spaced at any distance apart, up to the maXiHu (West EPT) Dis.mum length allowed by engineering constraints.
At EPT we are totally dedicated to providing our consumers with the very best in scaffolding and components. We feel in likely the additional HangEPT to make certain that every single consumer is pleased. We have the encounter (more than fourteen many years) and the track record in the discipline to supply the scaffolding goods that consumers require to expedite their projects and guarantee good quality and safety.
CORONET Heritage
CORONET SCAFFOLD EPT, 1 OF THE Leading AND MOST Certified SCAFFOLDING Organizations Right here IN CHINA.
With the head quarter in HangEPT, EPTTngsu Province, EPTT and a department place of work in California, U.S., EPT Scaffold is a scaffold maker launched in 2004. We can give our consumers with expert scaffold solutions. To satisfy the calls for of different markets, we also provide numerous scaffold techniques, incXiHu (West EPT) Dis.Hu (West EPT) Dis. ringlock, cuplock, scaffolding frame, tube amp clamp, sidewalk bridge, c60 hefty duty scaffolding, QES and formwork programs and so on.
Custom made Scaffold
EPT has an outstXiHu (West EPT) Dis.Hu (West EPT) Dis. merchandise design and style group, creation management crew and top quality assurance team that perform jointly seamlessly in orEPTTto supply specialist scaffold solutions and OEM provider for buyers.
In 2015, we presented development scaffolds for a government plan in Cochabamba, EPTTvia. In accordance to the client’s requirement, we deveXiHu (West EPT) Dis.Hu (West EPT) Dis.ed a scaffold that could bear 60KN force, which we named C60 EPT Obligation Scaffolding.
In 2014, we presented approXiHu (West EPT) Dis.mately ten,000 tons of EPT scaffolds to Koniambo Nickel SAS in EPTT Caledonia.
EPT
Our scaffolds are generally made from Q235 and Q345 steel. If the scaffolds are to be used in very chilly locations like winter season in Canada, Q345D can be utilized as it can stand up to effect of -twenty ordmC.
Production Approach
As a professional scaffold manufacturer, EPT operates with a comprehensive set of EPTd manufacturing processes: raw materials inspection, mechanical processing, welding, surface treatment method, surface restore, erection.
– Uncooked material inspection
– EPT processing
– EPT
– Floor treatment method
– Floor repair
– Erection
EPT EPT
We have skilled scaffold workshops equipped with EPTd production gear, incXiHu (West EPT) Dis.Hu (West EPT) Dis. punching EPTTs, welding EPTTs, pipe slicing EPTTs, shearing EPTTs, bending EPTTs, screw EPTTs and so on. Our faXiHu (West EPT) Dis.Hu (West EPT) Dis.ties make certain item good quality and efficiency. Our current yearly manufacturing is up to thirty,000 tons.
Testing Unit
We have expert screening devices such as Vernier calipers, spiral micrometers and zinc coat thickness gauges and so on. To make positive the merchandise meet JCEPs, EPT has estabEPTTd a good quality assurance office, strictly carry out raw material inspection, method management and conclude solution evaluation.
Certifications
EPT is EPT firm as we do have numerous certifications for all-spherical scaffolding items across world to satisfy worldwide customer’s ask for.
At EPT, all of our supplies are certificated by under laboratories and we are stXiHu (West EPT) Dis.Hu (West EPT) Dis. by to offer you all of products analysis, testing.
Ringlock System:
- US: EPTT / SSFI SC100-5/05, certificte# Cor006-12-twelve-09676 by Element.
- Austrilia / EPTT Zealand :AS/NZS 1576.one:2571 AS/NZS 1576.two:2009 AS/NZS 1576.three:2015, report MT-15/392-B/C/D/E/F by Melbourne Tests Solutions.
- Argentina: INTI EN12811 certificate by INTI-N sixty three-31300
- Columbia : INFORME PRUEBAS DE LABORATORIO by ESCUELA COLOMBIANA DE INGENIERIA JULIO XiHu (West EPT) Dis.Hu (West EPT) Dis.AVITO
Cuplock System:
- EPTT / SSFI SC100-five/05, certification# Cor006-twelve-12-09683 by Aspect
Scaffold metal plank:
- Stop shut planks complies with AS/NZS 1577:2013, report # MT-fifteen/392 by Melbourne Tests Solutions.
- SSP complies with AS/NZS 1577:2013, report # MT-15/392-A1/A2/A3 by Melbourne Screening Solutions.
- plank complies with AS/NZS 1577:2013, report # SHIN160757118CCM by SGS
- Decrease profile steel plank complies with EPTT/ASSE A10.8-2011 report # SHIN160803006CCM by SGS
Kwikstage Technique:
- AS/NZS 1576.three:2009, report # MT-thirteen-037 by Melbourne Tests Providers.
Body Method:
- EPTT/SSFI SC100-five/05, certificate # Cor001-09-twelve-94129 by CarEPTTn Laboratory Columbia College.
- EPTT/SSFI SC100-5/05, certification # SHIN16095717CCM by SGS
- Body max. leg load and uniform load, report #SHIN160857172CCM by SGS