General Description
Equipped with all the zero leak bidirectional checking sole-noid valves, this power unit is built for your operation of two independent circuits. Which are respectively for your principal and subordinate platforms from the double scissors lift. Two cut-off valves are applied for lowering the machine manually in situation of energy loss. If much more independent circuits are expected for the application please get in touch with us for availability.
Remark: one. Please check with our revenue engineer for your various pump displacement, motor electrical power or tank capacity.
two. CSA or UL certified motors are available upon request.
Particular Notes
1. The AC motor is of S3 duty cycle, which can only get the job done intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean each of the hydraulic components concerned ahead of set up of the power unit.
3. Viscosity of your oil shoud be 15~46 cst,and the oil should really be clean and totally free of impurities,N46 hydraulic oil is suggested.
four. The electrical power unit should really be mounted vertically.
5. Check the oil level within the tank immediately after the initial operating of your power unit.
6. Oil transforming is needed immediately after the first a hundred operation hrs,afterwards when each 3000 hours.